Photos

 

2-JimNaismith.jpg (66556 bytes)

A 42" diameter pipe delivers water to the reservoir.

 

6-JimNaismith.jpg (85919 bytes)

Construction of the pump station intake (foreground) and the pump station (background).

 

7-JimNaismith.jpg (71365 bytes)

The pump station sends water from the reservoir to water treatment plants via a 42" diameter pipe.

 

1-JimNaismith.jpg (37260 bytes)

The soil-cement slope protection was kept moist 7 days after placement for proper curing.

 