| Project Name |
Project Description |
Project Location |
Client |
| Street
Improvements 2001 Design |
Designed $1.2
million street project including reconstruction, patching, surface treatment, and
overlays. |
Hill Country
Village, Texas |
City of Hill
Country Village
116 Aspen Lane
San Antonio, TX 78234 |
| Pedestrian
Thoroughfare Feasibility Study |
Developed costs to
extend walkways and bike paths throughout key parts of the City. |
Hill Country
Village, Texas |
City of Hill
Country Village
116 Aspen Lane
San Antonio, TX 78247 |
| Sewer Extension on
US 281 Feasibility Study |
Developed costs to
extend a sewer line to unserved areas. |
US 281, Hill
Country Village, Texas |
City of Hill
Country Village
116 Aspen Lane
San Antonio, TX 78252 |
| Coolway Drive
Closure Design |
Designed the
closure of a 400'-long street, including utility and walkway coordination. |
Cool Way Drive,
Hill Country Village, Texas |
City of Hill
Country Village
116 Aspen Lane
San Antonio, TX 78254 |
| Crest Trail
Extension |
Designed a
turnaround for a dead-end street, including diversion of a small creek. |
Crest Trail, Hill
Country Village, Texas |
City of Hill
Country Village
116 Aspen Lane
San Antonio, TX 78255 |
| Street &
Utility Mapping 2001 |
Revised city
mapping to show new subdivisions and utilities. |
Universal City,
Texas |
City of Universal
City
2150 Universal City Blvd.
Universal City, TX 78150 |
| Olympia 18
Subdivision Municipal Review |
Reviewed 7-acre
residential subdivision for compliance with city regulations. |
Universal City
Blvd., Universal City, Texas |
City of Universal
City
2150 Universal City Blvd.
Universal City, TX 78151 |
| Athenian Park
Design |
Designed 0.5-mile
jogging trail and parking lot for 16-acre municipal park. |
Athenian Drive at
Pat Booker Road, Universal City, Texas |
City of Universal
City
2150 Universal City Blvd.
Universal City, TX 78152 |
| HWP Sewer Line
Study |
Coordinated tests
for sewer lines in the Edwards Aquifer Recharge Zone in order to test for leaks and to
comply with TNRCC requirements. |
Mecca Drive at US
281, Hollywood Park, Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78232 |
| HWP Sewer Line
Repair Construction |
Coordinated the
sealing of leaks found in sewer lines and manholes in the Edwards Aquifer Recharge Zone to
comply with TNRCC requirements. |
Mecca Drive at US
281, Hollywood Park, Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78233 |
| 2001 Street
Drainage Feasibility Study |
Evaluated 5 street
flooding areas and determined budgeting for future improvements. |
Hollywood Park,
Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78237 |
| Pantheon
Subdivision Municipal Review |
Reviewed 10-acre
commercial subdivision with 5 lots for compliance with city regulations. |
Pantheon at US
281, Hollywood Park, Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78238 |
| 2001 Street
Improvements Preliminary Study |
Establish 5-year
plan for maintaining and repairing 25 miles of streets. |
Hollywood Park,
Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78239 |
| Paseo Canada
Drainage Construction |
Performed
construction observation for 700 feet of 15" underground storm drains. |
Paseo Canada,
Hollywood Park, Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78240 |
| National Flood
Insurance Program & Admin Duties |
Serve as
Floodplain Administrator, review proposed plans for floodplain encroachments, and update
ordinances to comply with latest FEMA regulations. |
Hollywood Park,
Texas |
Town of Hollywood
Park
2 Mecca Drive
San Antonio, TX 78242 |